Running a data cable to a machine is expensive.
Older machines, pumps and drives often have no data line. Laying one in a running facility means work at ceiling height, core drilling through concrete and sometimes stopping production. The power cable, however, already reaches every machine.
Usually
- A new data cable to every machine
- Cable trays, core drilling, lifting platforms
- Downtime while the work is done
With WattBus
- One module at each end of the existing power cable
- DIN-rail mounting in the existing cabinet
- No cable work in the production area
All prices incl. 19% VAT. Sources, checked in November 2026: meister-job.de (concealed cabling incl. chasing and plastering), angebots-meister.de (core drilling, net price plus 19% VAT), dein-elektriker-info.de (electrician in medium-sized and large cities). Per machine: 100 m of concealed cabling, cable work only.